Essays24.com - Term Papers and Free Essays
Search

Peter Olafson

Essay by   •  December 26, 2010  •  1,499 Words (6 Pages)  •  2,066 Views

Essay Preview: Peter Olafson

Report this essay
Page 1 of 6

PETER OLAFSON

BACKGROUND

Peter Olafson has just taken a position as the general manager for Cable King Television (CKV) of St. Paul Minnesota. CKV has been in existence for the past four years. The company is by UniComm of Beverly Hills California and a local St. Paul businessman, 85%-15% respectively. The first three years of CTV were spent securing state, federal, and local franchises and permission to operate in the St. Paul area. When Olafson arrived, CTV had six employees working on the design, preparation, and initial construction of the cable system.

CTV's parent company, UniComm, was founded by William Jurgens. Jurgens built UniComm up from a small west coast cable system to $25 million company that now ranks within the top 20 firms in the nation. Jurgens is known as tough business man, a self made man who aggressiveness and ability brought him considerable success.

Peter Olafson has just graduated with his MBA; his credentials include BS in electrical engineering from MIT and an MS in communications engineering from the University of Minnesota. He also worked his way up to a captain in the United States Army Signal Corps. Olafson took a job with CTV because he saw cable television as a field with great growth, opportunity, and expansion since it was primarily dominated by private entrepreneurs. When Olafson was given the job offer from Jurgens, Olafson was informed that the general manager assignment at St. Paul would be challenging. The system was having a number of serious start-up problems; however, Jurgens noted the St. Paul-Minneapolis market had the possibility of being a very profitable market. Olafson has no prior cable television experience however since he is assuming he is to work under Jurgens, he can learn from him.

The issues Olafson faces are varied. When he reports to work he is not reporting to Jurgens, he is reporting to Jim Harvey. Harvey is the director of budgets and plans and now is in charge of all pre-operating systems. Much to Olafson's chagrin Harvey has no system operating experience so he is unable to offer any advice or guidance. A second issue facing is that the chief engineer, Kurt Anderson, is having difficulties planning and organizing the for the construction activities. Anderson is not a trained engineer, he worked his way up from line installer to chief engineer and has a reputation as being a first rate technical employee. After working with Anderson for a few months, Olafson realized that Anderson the administrative ability of prior knowledge to start a brand new operation. The last hurdles faced by Olafson were three personnel changes / additions; Olafson added Jeff Wadsworth, a recent college grad who was hired as the director of marketing. Wadsworth is seen as an aggressive ambitious young man. The second addition was Christopher "Tucker" Barnes, the head of the installation department. Tuffer is a 27 year old college grad who has a great deal of hands on knowledge regarding the equipment and procedures. The third addition is Sabrina Hayes, educated by a social worker, to work in the right of way department. She is noted for her ability to organize things and get it done.

PROBLEM

The main problem facing Olafson is his inability to influence routinely influencing Harvey and Anderson. There are multiple examples of Olafson having a hard time trying to persuade Harvey listen to his ideas regarding on how the operation should be conducted in St. Paul. From the text: "Olafson was unsuccessful, however, in influencing Harvey to reverse the decision (grid mapping versus power supplies) as it applied to St. Paul. This created further problems with deliveries and the new power supplies did not arrive until the end of February." A second example, regarding local and government public access support:

"Olafson had been approached numerous times by local citizens and representatives of the state cable commission concerning how much support Cable King was willing to give to public access. As a result, Olafson had raised the issue with Harvey several times and he went so far as to send Harvey a memo outlining the equipment needed to satisfy local demands. To Olafson, the funds needed were insignificant, given the benefits the public and the company could derive, but every time he raised the matter with Harvey he felt he received a runaround. Because he got no definite answer from Harvey, Olafson found he had to equivocate with the state commission on how much Cable King could offer."

From the text we see that Olafson's difficulty with Harvey is causing a schedule slip and possible future problems with the local officals, not good for the company.

Olafson was having similar issues with Anderson; Olafson could not influence Andersons actions enough to get the desired results. From the text: "Olafson took several steps in attempting to help Kurt improve the planning and coordination. One of these was having one-on-one counseling sessions to show Kurt how to plan better, A second step he took was to have Kurt call weekly construction meetings to which everyone in the organization was invited, including the new subcontractor supervisor, "Happy" DiStellanoÐ'...Kurt did not become involved enough in most of them."

...

...

Download as:   txt (8.6 Kb)   pdf (108.3 Kb)   docx (12 Kb)  
Continue for 5 more pages »
Only available on Essays24.com