Essays24.com - Term Papers and Free Essays
Search

Implementing An Asrs

Essay by   •  December 27, 2010  •  575 Words (3 Pages)  •  1,261 Views

Essay Preview: Implementing An Asrs

Report this essay
Page 1 of 3

IMPLEMENTATION of CanGo ASRS

Implementation is the carrying out, execution, or practice of a plan, a method, or any design for doing something. As such, implementation is the action that must follow any preliminary thinking in order for something to actually happen. In an information technology context, implementation encompasses all the processes involved in getting new software or hardware operating properly in its environment, including installation, configuration, running, testing, and making necessary changes.

Implementation management team has a vast experience in a wide variety of industries to make sure your project is a success. Remstar provides smartly designed, cost effective integrated material handling systems that are focused on meeting your business objectives. Our business is the research, design, engineering, installation, system commissioning, and training throughout the whole project. Remstar's project managers are responsible for all aspects of your project and we work closely with the leading equipment manufacturers to make sure your system is operating at its maximum capability and effectiveness. From managing the schedule to ensuring the quality of installation at your site, our project manager is the single point of contact simplifying the whole process for you.

The installation of the hardware and software is a very complex task, which required a lot of work and attention to detail. Making sure all components are working to getting is the top priority of RemStar. The installation is outline if phases for the first week CanGo will be preparing the location for the installation of the ASRS. By the second week the hardware will be delivery for installation. During this time the programmers will be working with RemStar software department to integrate their software into our system.

In week three and four the software will be installed and tested for operational usage. By this time the installation for the hardware will be completed, to allow system integration of the hardware and the software coming on line together. This in-turn will allow for the programmers to fine the system to specification. And finally during week five and six testing will be finalize system will be further fine to CanGo Specification. Once all components have been proven operational to CanGo's and manufacture standard product will be delivered to CanGo.

IMPLEMENTATION SCHEDULE Weeks 1-2 Weeks 3-4 Weeks 5-6

Hardware Installation:

Talk to Vendors & Compare Pricing

Removal old equipment X

...

...

Download as:   txt (3.8 Kb)   pdf (70.6 Kb)   docx (9.9 Kb)  
Continue for 2 more pages »
Only available on Essays24.com
Citation Generator

(2010, 12). Implementing An Asrs . Essays24.com. Retrieved 12, 2010, from https://www.essays24.com/essay/Implementing-An-Asrs/26017.html

"Implementing An Asrs " Essays24.com. 12 2010. 2010. 12 2010 <https://www.essays24.com/essay/Implementing-An-Asrs/26017.html>.

"Implementing An Asrs ." Essays24.com. Essays24.com, 12 2010. Web. 12 2010. <https://www.essays24.com/essay/Implementing-An-Asrs/26017.html>.

"Implementing An Asrs ." Essays24.com. 12, 2010. Accessed 12, 2010. https://www.essays24.com/essay/Implementing-An-Asrs/26017.html.